Image

Leaders in Integrated Abandonment in Colombia

Integrated Dropouts

12 years of experience in the sector

Excellent operational and HSEQ results support our work.

Wells are the primary assets in all oil and gas field development. These, once they reach their economic limit or present serious integrity damages, which make their operational continuity unfeasible, must be abandoned in accordance with the current regulation of the Ministry of Mines and Energy, Resolution # 40230 of July 7, 2022.

A job of technical abandonment of wells, for their full disincorporation, involves various services which must be very well coordinated and integrated in order to achieve a safe and successful intervention. In essence, any abandonment work must have a rigorous planning that considers all the potential risks that may arise in a major intervention of wells (workover), with this the best intervention program and the mitigation measures of the determined risks can be designed.

Image
Image

EXECUTION

Well Abandonment

Surface Integrity Check and Wellhead Assurance

Intervention with well service equipment to unload pressure inside the well

Removal of completion elements still inside the well

Cleaning by means of hydraulic circulation and maintaining control with brine type

Acquisition of records of the integrity of the coating and the state of the existing cementation.

Cannonades to force cement and establish the barriers required for abandonment

Cementing operation, balancing of isolation plugs or forcing and circulation of cement that guarantee the hermetic seal of the pressures and fluids for their control towards the surface or intermediate aquifers

Installation of monument and plaque that summarize the technical data of the well, its productive life and the dates of drilling and final abandonment.

Image
Image

OUR

Equipment and Technologies

We have equipment for all types of conditions

Service to RSU (Rapid Service UNIt) and WHU (Workover Hydraulic Unit) wells

Cementation

Coiled Tubing

Wireline (Electrical Records and Cannonade)

Thru Tubing Services

Completion and WBI

Image
Image

OUR

Job

We have trained personnel to

development of operations

Management of all stages of technical well abandonment projects from the review of available information on wells, planning and construction of the most appropriate intervention programs, design and execution of operating programs, delivery of reports and forms before regulatory bodies.

Suitability and capacity of our technical and support staff, with extensive experience in the design and execution of well intervention operations, with full responsibility for all aspects involved in integrated abandonment services, such as well operations, the logistics and optimized use of loads, facilitating the mobilization between wells, the integral management

Added value by being able to offer the integrated management of the operation and all the services directly by GES as a package, optimizing administration costs and generating synergies between lines, for the benefit of the projects

Image

KNOWN

Successful Operations

Excellent operational and HSEQ results support our work
Integrated technical abandonment of wells in the Magdalena Medio area
It had a scope of three wells, slightly deviated and with depths of up to 8,100 feet. This project contemplated the stages of information review, operational pre-designs and the execution of the abandonment works as such.

In case of doubts about Integrated Abandonment

CONTACT AN EXPERT

Javier Nevito Gómez
javier.nevito@guacamaya.energy