- Coiled Tubing service, nitrogen and high pressure fluid pumping.
- Cementation service, abandonment and remedial plugs.
- Well Testing services and surface fluid reception.
- Work Over equipment, RSU and Snubbing units, Fast move up to 198,000 Lbs.
- Tools services for intervention of Wells and Well Control.
- Cased Hole and Open Hole electrical log service, perforation and other WireLine and Slick Line services.
- Well stimulation services with the capacity to treat any damage.
- Water injection services for recovery of production or disposal.