Image

Leaders in Coiled Tubing in Colombia

Coiled Tubing

12 years of experience in the sector

Excellent operational and HSEQ results support our work.

At Coiled Tubing we stand out for offering innovative solutions with the use of specialized back-end tools that can be implemented to:

Wax and sand removal

Cement grinds and plugs

Remedial cementing operations and abandonments

Isolation of water areas, fishing, stimulation and surveys with N2, among other operations.

We have equipment for all types of conditions, oil or gas wells with the presence of H2S, low or high pressure reservoirs, shallow or deep wells up to 20,000 ft.

We have injector heads from 30K to 100K in self-propelled units ideal for work in small locations, a helicoportable CT unit for difficult areas

Image

access, a set of CT in Skids for Offshore work on the platform and conventional trailer equipment for the most demanding jobs (high pressure, high temperature). Our flexible tubing in sizes from 1-1/2" to 2-3/8" and lengths up to 22,000 ft.

Image

OUR

Equipment

We have equipment for all types of conditions.

Oil or gas wells with the presence of H2S, low or high pressure reservoirs, shallow or deep wells up to 20,000 ft.

We have injection heads from 30K to 100K in self-propelled units ideal for work in small locations, a helicoportable CT unit for areas with difficult access, a set of CT on Skids for offshore platform work and conventional trailer equipment for the most demanding jobs. (high pressure, high temperature). Our flexible tubing in sizes from 1-1/2" to 2-3/8" and lengths up to 22,000 ft.

Image

CERTIFICATION IN
ISO 9001, ISO 14001,
OHSAS 18001

Image

OUR

Coiled Tubing Services

We have trained personnel to
the development of operations
Image

KNOWN

Successful Operations

Excellent operational and HSEQ results support our work
Milling and cleaning operations in the completion area – Wellbore clean out Chichimene
Wellbore clean out operations in the completion area using 6.0” OD grinders and well cleaning with cleaning fluid train and rotational hydraulic cleaning tools up to <45 NTU.
Coiled tubing gas lift / Speed strings Coiled tubing gas lift Piedmont
Operations to hang speed strings and coiled tubing gas lift using 2.0” tubing in PC-2 category wells according to API 16ST
Zone change operations (Opening and closing of SSD) Opening and closing of SSD in Jaguar & Cara Cara
Operaciones de apertura y cierre de camisas para evaluación de zonas o estimulaciones matriciales por etapas.

In case of doubts about Coiled Tubing

CONTACT AN EXPERT

Juan Bernardo Nieto
Líder de Coiled Tubing
Juan.nieto@guacamaya.energ